阙敏 李忠
摘要: 高层建筑的深基坑工程往往是现在工程事故的频发现象,究其原因,主要在于工程实施过程没有充分做好各项工作,工程技术方案不符实际水文地质要求,生搬硬套,拿来主义,没有真正结合工程实际情况,认真分析实际数据。施工过程安全管理体系缺乏及管理制度匮乏;降排水与止水方案错误或实施无依据;深基坑监测工作流于形式,没有落到实处等等均是导致事故发生的导火线,本文就如和做好深基坑工程的实施过程的技术要领做些阐述。
关键词:高层建筑 深基坑安全体系 监测
Abstract:The high-rise building of deep excavation often is now engineering accident and frequent phenomenon, investigate its reason, main is to project implementation process does not fully to complete each work, engineering technology solutions dishonest hydrogeology requirements, derivative, copycat, no real combined with engineering practice, carefully analyzing the actual data. The construction process of safety management system and management system, the scarce With the draining water error or implementation scheme without basis; Deep foundation excavation monitor work become a mere formality, no into effect and so on all is lead to the accident happened fuse, this paper as and to the implementation of the deep foundation pit engineering process technology will bring do some in this paper.
Keywords: high building deep foundation pit safety monitoring system
中图分类号:TU97文献标识码:A 文章编号:
【正文】
在城市化高速运转的今天,日趋紧张的土地资源催化了摩天大楼的诞生,带来了高度集约化土地的利用和城市形象的提升。中国的人口多,地资源有限,经济要发展,人民生活要改善 ,需要建造更多、更好的高层建筑。而摩天大楼往往伴随着深基坑工程的实施,结构工程师绞尽脑汁设计符合安全又充分利用土地的基础结构。深基坑就孕育而生,由此带来的深基坑技术及安全要求也越来越高,给予我们工程技术人员的思考也越发重要和紧迫。
所谓深基坑,一般指开挖深度大于5米的基坑,深基坑施工前,应了解建筑现场及周边,地表至支护结构底面下一定深度范围内地层结构、岩土性状、含水层性质、地下水位、渗透系数等;了解建筑施工现场及其附近的地下管线,地下埋设物的位置、深度、结构形式及埋设时间等。……