尹富斌
摘要:近年来我国城市地铁建设迅速发展,随着隧道施工技术的提高,盾构施工法作为一种安全而又环保的施工方法得到了广泛的使用,其中土压平衡式盾构在我国的使用最为普遍,成为地铁隧道施工技术的主流。本文结合武汉市地铁2号线盾构1标,范—王区间左线盾构施工经验,对土压平衡盾构在渗透系数高的富水砂层中的掘进技术进行了探究。
关键词:土压平衡盾构隧道施工技术发生机理
中图分类号:U455文献标识码:A文章编号:
Abstract: urban subway construction in China in recent years the rapid development, with the improvement of tunnel construction technology, construction method of shield as a kind of safety and environmental protection construction method has been widely use, including earth pressure balance type shield in our use of the most common, become the mainstream of the subway tunnel construction technology. Combining with the wuhan city metro line 1 mark shield, fan-the king of the left line interval shield construction experience, about the soil pressure balance shield in the permeability coefficient of high rich water sand layer tunneling technology in the study.
Key words: soil pressure balance shield tunnel construction technology occurrence mechanism
1. 工程概况
范湖站~王家墩站区间线路起讫里程为:DK5右+982.627~DK7右+166.325,左线长为1191.584m,右线长为1183.698m,总长度为2375.282m。设有一个联络通道,与泵房合建,里程CK6(右)+574.247;设有一个曲线,曲线半径为700m,线间距13~15m,线路最大纵坡坡度26.7‰,最小坡度2‰,最大埋深19m,最小埋深9.1m。区间隧道为外径6m,内径5.4m,管片拼装衬砌的单洞圆形隧道,管片环宽1.5m,管片砼C50,S12。
2. 施工技術难点、风险点及一些工程事故的概念和发生机理
2.1施工技术难点、风险点
根据本区间地质纵断面图,隧道含930m富水全断面粉细砂层,隧道上覆土层多为回填土地层空隙大,本区间地下水为孔隙承压水,水位距地表约3~4m。水量丰富、具承压性、砂土容易液化,是本区间施工中的主要难点。结合武汉地铁2号线范—王区间施工过程,掘进施工中存在以下风险:
①全断面粉细砂层中掘进,,容易出现,闭塞、喷涌、结泥饼等工程事故,刀盘扭矩、千斤顶总推较大;
②在富水全断面粉细砂层中掘进,出土量不好控制容易出现地面沉降问题,且本区间地面建筑物复杂,尤其是要从高压变电站主控室下面通过,稍有沉降将会发生大范围停电等用电故障,后果不堪设想;……