赵书涛 陈曦 张茜
摘要:隧道斜井是在长隧道施工时,为了增加作业面缩短工期而设置的连接地面和地下隧道具有一定倾斜角度的井筒。因为斜井是以一定的倾角向下倾斜,故斜井防排水是斜井施工时一项要重点考虑的问题。本文根据某特长隧道斜井实际地质水文情况,采用“防、排、堵、截相结合” 因地制宜,综合治理”的原则,以引排水为主,堵截为辅,有效的排泄了斜井的渗水,保证了施工质量。
Abstract: In the long tunnel construction, tunnel slope is to increase operation to shorten time limit for a project and set up the connection of the ground and underground tunnel has a certain Angle of the shaft. Because the slope is a certain Angle downward sloping, the deviated well waterproof and drainage is inclined shaft construction which should consider the problem. In this paper, according to a special tunnel slope actual geology and hydrological conditions, using the "prevent, platoon, plugging, cut combination" adjust measures to local conditions, comprehensive management "principle, in order to lead drainage is given priority to it, and an ounce of prevention is worth a block, the effective discharge of water seepage of the slope in order to ensure the construction quality.
关键词语:斜井;防排水;集水坑
中图分类号:TD55 文献标识码: A 文章编号:
一、前言:
伴随我国公路运输的不断发展,隧道在公路运输过程中发挥了重大作用。斜井也是隧道众多总类其中的一种,在斜井施工过程中会遇到与隧道施工相同的问题,比如裂隙、断层、破碎带、地下水等复杂地质情况,这些部位正是地下水易涌、易渗的位置,由于斜井本身的特殊性,这就要求我们在设计中对隧道防排水给以足够的重视。
隧道斜井防排水设计要考虑两个时期:第一个时期在施工阶段;第二隧道竣工后阶段。在隧道施工阶段,斜井的防排水必须要靠斜井自身的排水系统来排出洞外,而竣工后斜井防排水是通过斜井排水系统将水汇集到隧道主洞的排水系统内,由主洞排水系统排出洞外。
二、水文地质条件:
1、工程概况:
某特长隧道斜井位于山西省阳泉市盂县境内,长度为1551米,斜井井口与洞底的高差为103米,从洞口到洞底每隔300m设置一处长度为40m、坡度为2%的缓坡段,其余地段坡度为7.6%。……