浅谈勘察设计桩基施工一体化组织模式的优点

2012-09-06 00:54:06杨大兵帅学海张军杨明
城市建设理论研究 2012年22期
关键词:设计

杨大兵 帅学海 张军 杨明

摘要:安置房小区建设工期紧迫,我单位实施勘察、设计、桩基施工一体化,在最短时间内圆满的完成了任务。结合此次勘察、设计、桩基施工一体化过程,总结出几点经验,以期在今后的工程实践中不断总结和提高技术水平,为发展勘察、设计、桩基施工一体化的理论和实践做出贡献。

关键词:勘察;设计;施工一体化;节约成本;缩短工期。

Abstract: The placement of the Housing Area construction period is urgent, and I units in the survey, design, integration of Pile Foundation Construction, the successful completion of the task in the shortest possible time. Combined with the investigation, design, pile foundation construction in the integration process, summed up a few experiences to constantly sum up in the future engineering practice and improve the technical level for the development of the survey, design, pile foundation construction in the integration of theory and practice do contribute.

Key words: inspections; design; construction integration; cost savings; shorten the construction period.

中图分类号: U469.6+92 文献标识码:A 文章编号:2095-2104(2012)

在经济腾飞今天,时间就是金钱,效率就是生命,所以,建设工程的工期也就成了大家最为关心的一个话题。怎样高效施工缩短工期,怎样在缩短工期的同时节约成本,以及怎样在缩短工期、节约成本的同时保证工程质量?现谈谈我公司对一安置房工程的勘察、设计、桩基施工一体化工程中遇到的困难及解决方案和经验总结。

一、工程概况

乔山安置房是马鞍山市重点民生工程,位于安徽马鞍山市东北部(城市出入口),慈湖河路与葛羊路交叉口的东南角,东至宁安城际铁路,南至桥山路,西至慈湖河路,北至高速出入口,总用地面积约273547.64平方米。其中代征道路用地面积约56488.50平方米,规划建设用地面积约204609.13平方米。一期工程占地规划面积135281.88㎡,建筑面积177490.59㎡,共36栋单体住宅楼,3个地下车库,另有幼儿园、农贸市场等配套附属设施。

该工程工期紧, 5月9日项目确定,市里领导要求在3天内作出设计方案,同时要求第二天组织勘探队伍进场,3天内出勘察资料,10天后出施工图设计,确保5月28日前开工建设,要求在本年底完工。……

登录APP查看全文

猜你喜欢
设计
二十四节气在平面广告设计中的应用
河北画报(2020年8期)2020-10-27 02:54:06
何为设计的守护之道?
现代装饰(2020年7期)2020-07-27 01:27:42
《丰收的喜悦展示设计》
流行色(2020年1期)2020-04-28 11:16:38
基于PWM的伺服控制系统设计
电子制作(2019年19期)2019-11-23 08:41:36
基于89C52的32只三色LED摇摇棒设计
电子制作(2019年15期)2019-08-27 01:11:50
基于ICL8038的波形发生器仿真设计
电子制作(2019年7期)2019-04-25 13:18:16
瞒天过海——仿生设计萌到家
艺术启蒙(2018年7期)2018-08-23 09:14:18
设计秀
海峡姐妹(2017年7期)2017-07-31 19:08:17
有种设计叫而专
Coco薇(2017年5期)2017-06-05 08:53:16
从平面设计到“设计健康”
商周刊(2017年26期)2017-04-25 08:13:04