摘要:随着交通运输的高速发展,铁路运能也在不断增长,与此同时社会需求不断提高,原有的铁路运营模式也面临着严峻的考验,为此,我们在实践中要不断的更新铁路技术。我国很多铁路施工单位在接触网上部施工中,已经实现了支柱装配、承力索架设、接触线架设与调整、吊弦安装一次综合考虑、一步到位,这是接触网施工中的新突破,对于保证电气化铁路的安全运营具有重要意义.当前,我国电气化铁路施工进入一个新的发展时期,电气化铁路正向高速电气化铁路发展。高速电气化接触网施工,在我国电气化铁路建设史上无经验可以借鉴。所以我们必须坚持科学创新,不断改进技术,在施工中摸索好的方法与经验。
关键词:高速电气化铁路;接触网施工; 施工技术与工艺
Abstract: along with the fast development of transportation, railway transportation capacity is also growing, meanwhile the social demand increases, the original railway operation mode is also facing a severe test, and therefore, we must constantly update railway technology in practice. High speed electrification contact network construction, the construction of our country electric railway history have no experience can learn from. So we must adhere to the scientific innovation, continuous improvement of technology, the construction method and experience of exploration well.
Key words: high speed electrified railway contact net; construction; construction technology
1.工艺原理
其工艺原理为:利用工序间影响最终质量的主要因素加以综合分析,实行提前控制和优化。据此对影响支柱装配、吊弦安装整体到位、承导线超拉的各数据中可变化的部分(现场的支柱状态和线路情况),通过现场实测取得每一个实际数据,利用计算机应用软件计算出实际预配安装尺寸;从而实现测量、计算、预配、综合考虑、一次到位的优化工艺。接触网上部结构综合考虑、一次到位安装技术的应用,能极大提高劳动生产力。其功法特点是:有效改善弓网关系,减少硬点,提高接触网平滑程度,减轻受电弓磨损,从而杜绝弓网事故的发生。……