张军
摘要:某高层住宅楼采用预应力高强混凝土空心方桩(PHS桩)基础,因地层分布原因且施工质量控制措施不到位,经对试桩进行检测后发现较严重质量问题。本文通过对场地地层条件、PHS桩特点及检测数据的分析,提出后续施工建议,为同类桩的设计及施工提供借鉴。
关键词:PHS桩;接桩缝;贯入度;承载力
Factors affecting the carrying capacity of PHS pile
Zhang Jun
(Xian Engineering Investigation and Design Research Institute of China Nonferrous Metals Industry)
Abstract: A high-rise residential building with prestressed high strength concrete hollow square pile (PHS pile) foundation, because of the formation and distribution of the construction quality control measures are not in place, the test pile is found to be more serious quality problems. This paper puts forward the following suggestions on the design and construction of the same kind of pile, by analyzing the characteristics of the ground and the PHS pile and the analysis of the test data.
Key words: PHS pile; crack of pile splicing; pentration; carrying capacity
1 引言
近几年来,随着西安地区城市建设的发展,高层建筑成为建筑市场的主角。做为桩基础的一种类型,预应力高强混凝土空心方桩(PHS桩)具有单桩承载力比管桩(PHC桩)更高,可有效降低建筑物建设成本的优势,因此逐渐在高层建筑桩基础中应用。PHS桩在施工过程中受地层及沉桩设备的影响,单桩承载力常出现不满足设计要求的现象。本文结合西安地区某工程实例,结合基桩检测结果,对PHS桩施工中易出现的质量问题原因进行分析,为该型桩的施工及检测积累经验。
2 工程概况及地质条件
西安某高层住宅楼为地上32层剪力墙结构,梁板式基础,墙下布桩,试桩采用边长500mm,壁厚300mm预应力高强混凝土空心方桩,设计桩长28.0m,单桩竖向承载力特征值Ra=3200kN。场地地貌单元为渭河北岸Ⅱ级阶地,主要地层为:②层黄土(Q32eol),可塑状态,层厚4.30~11.30m;③层古土壤(Q3el),可塑状态,层厚3.10~4.70m;④层粉质粘土(Q3al),可塑状态,层厚12.30~19.10m;④-1层中砂(Q3al),中密状态,呈透镜体存在,层厚0.60~2.00m;⑤层中砂(Q3al),密实状态,层厚1.30~7.00m;⑥层粉质粘土(Q3al),可塑状态,层厚1.20~10.40m;⑦层中粗砂(Q3al),密实状态,层厚6.70~8.40m。场地典型地层剖面下图1。
图1 场地典型地层剖面图
试桩设计选取⑤层中砂为桩端持力层,且进入该层不小于0.5m。……