浅谈大断面湿陷性黄土隧道施工技术

2015-10-21 17:19:53苏杰
建筑工程技术与设计 2015年6期
关键词:施工技术

苏杰

【摘要】本文结合郑西客运专线凤凰岭隧道和高桥隧道的施工,通过对现场监控量测数据分析,总结了大断面湿陷性黄土隧道施工中弧形导坑法、CRD法、双侧壁导坑法的不同适用范围,指出其具体施工工艺步骤、质量控制要点及围岩的变形规律,同时指出隧道洞内基底湿陷性处理的措施。

【关键词】大断面;湿陷性;黄土隧道;施工技术

On The Construction Technology of Large Section collapsible loess tunnel

Su Jie

(China Railway 23th Bureau Group Co. Ltd. , Chengdu 610072,China)

Abstract Combining the construction of Fenghuangling tunnel with Gaoqiao tunnel PDL, through analysis of scene monitor and measure data, the thesis concludes different range of application of curve excavation method、CRD method and twin-side heading method in the large section collapsible loess tunnel construction, but also points out the detailed technology process、the key points of quality control and regular deformation of adjoining rock, and the measures how to deal with collapsible foundation in tunnel.

Keywords large section; collapsible; loess tunnel; construction technology

1 引言

黄土是我国北方地區常见的一种特殊土,是第四纪干旱、半干旱气候条件下形成的,其基本色调是黄色,黄土具空隙,垂直节理发育,直立性强,新黄土多具湿陷性。

在湿陷性黄土地区修建大断面黄土隧道有两个显著的特点:(1)湿陷性黄土地基的处理;(2)大断面黄土隧道开挖后拱顶及局部应力集中过大,拱顶沉降较大,造成隧道结构易失稳。因此在不同的地质情况下研究适宜的开挖方法,减小隧道拱顶沉降,有效抑制隧道围岩变形,在保证隧道施工安全的基础上加快施工进度,寻求一种克服洞内空间受限消除地基湿陷性的方法对大断面湿陷性黄土隧道施工有重要意义。

2 开挖方法的选择

大断面黄土隧道施工控制重点主要是要有效地控制围岩变形,因此围岩的情况决定了隧道施工方法的选择。

大断面隧道开挖控制变形,保证围岩稳定的原则就是化大为小,采用分部开挖支护 ,仰拱二衬紧跟。

对于埋深较大的IV级老黄土围岩,由于黄土具有直立性好、宜成型的特点,在适用短进尺的条件下,有一定的围岩稳定时间,保证在围岩未有大的变形掉块的情况下有足够的立架和喷锚作业时间,从而保证施工安全,采用弧形导坑法;……

登录APP查看全文

猜你喜欢
施工技术
建筑混凝土施工技术要点及有效对策分析
桥梁预应力工程的施工技术研究
高压输配电线路工程施工技术控制之我见
试析建筑工程施工技术及其现场施工管理探讨
浅析水利工程建设中的混凝土施工技术与施工管理
探讨水利水电工程防渗墙的施工技术
高层建筑主体结构施工技术及质量控制研究
施工技术在水利水电工程中的重要应用探究
水利水电工程建筑的施工技术及管理分析
试论关于水利工程冬季施工技术