安培卿 王恒
【摘要】在沙漠半固定沙丘如何考虑基础上拔关系到工程的经济性及安全稳定性。针对古尔班通古特沙漠半固定沙丘的地质特性,进行了750kV铁塔基础的抗拔试验研究。结果表明,基础深宽比接近1是比较合理的,而且上拔角按现行基础规定进行设计是偏于危险的。该结果为五彩湾-芨芨湖-三塘湖750kV输电线路工程沙漠地区的基础设计提供了依据。
【关键词】半固定沙丘;输电线路;斜柱板式基础;上拔角
Uplift bearing Capacity Research of Foundation of ultrahigh Voltage Transmission Line in Semi-fixed Desert Area
AN Pei-qing, LEI Guang-jie,WANG Heng
(Henan Electric Power Survey & Design Institute, Zhengzhou 450007, China)
For semi-fixed desert area, uplift bearing capacity of foundation is directly related to the economy and the security. For geological features of Gurbantonggute Desert semi-fixed dunes, uplift bearing capacity of 750kV transmission line tower was researched. The results showed that depth –to-width ratio closed to 1:1 is more reasonable, and uplift angle according to the current regulations is somewhat dangerous.The results provide a reference for the foundation design of Wucaiwan-Jijihu-Santanghu 750kV transmission line project.
Key words: semi-fixed desert area; transmission line; inclined-column slab foundation; uplift angle
引言:國家电网规划建设的五彩湾-芨芨湖-三塘湖750kV输电线路工程经过新疆古尔班通古特沙漠。该沙漠是中国第二大沙漠,同时也是中国面积最大的固定、半固定沙漠[1]。本工程经过沙漠区域大部分为半固定沙丘,半固定沙丘有一定的流动性,但与风积沙形成的流动沙丘又有明显区别[2]。在现行基础设计规定[3]中,对沙漠地区线路基础的计算方法及参数选取没有明确的规定。国外有学者对穿越沙漠的输电线路基础有过一些研究[4],国内学者也有相关的研究成果[5-6],但对超高电压等级的线路在半固定沙丘的研究,尚未见相关报道。
1、半固定沙丘基础抗拔试验
1.1 基础抗拔试验与上拔角取值
为了五彩湾-三塘湖750kV输电线路基础设计的安全稳定性,在新疆古尔班通古特沙漠进行了基础现场抗拔试验。以本工程沙漠地区使用较多的直线塔型ZB341B-45为例,按照现行基础规范[3],采用粉砂上拔角22°进行斜柱板式基础计算,设计了4个不同尺寸的基础。……