徐斌
【摘要】岩土工程施工是建设工程实施的第一阶段,在项目实施过程中对生产要素的需求是不断变化的。本文结合岩土工程施工的特点,初步探讨了项目实施过程中生产要素的配置及组合和实施动态管理。
【关键词】动态管理;生产要素;岩土工程施工
Introduction to Dynamic Management of Factors of Productionin Geotechnical Engineering Construction Project
Xu Bin
(Jiangsu Geological Engineering Ssurver Institute of Building MaterialNanjingJiangsu211135)
【Abstract】Geotechnical engineering construction is the first stage of implementation of construction project. During this process, the demand for factors of production is constantly changing. Combining with the characteristics of geotechnical engineering construction, this thesis lays preliminary discussion on the configuration and combination of factors of production, and dynamic management of factors of production during the implementation of the project.
【Key words】Dynamic Management;Factors of Production;Geotechnical Engineering Construction
1. 概述
(1)地基与基础工程是建筑施工的主导工程之一,也是建筑施工最为复杂、难度最大、工期最长、占投资最多的分部工程。而岩土工程施工是其重要组成部分,位于工程施工的第一阶段,施工质量好坏,直接影响到建筑物的安全和寿命,以及施工成本和工程整体的顺利进行。
(2)岩土工程最突出的特点是其不确定性。施工项目的实施过程,是一个不断变化的过程,其对生产要素的需求也在不断地变化。因此生产要素的配置和组合也就相应地需要不断调整,实施动态管理。动态管理是优化配置和优化组合的手段与保证,其基本内容就是按照项目的内在规律,有效地计划、组织、协调、控制各生产要素,使之在项目中合理流动,在动态中寻求平衡。
2. 岩土工程施工项目管理的内容与特点
(1)岩土工程施工项目管理是为使项目实现要求的质量、规定的时限、预算的费用所进行的全过程、全方位的规划、组织、控制和协调等全过程管理。其主要内容是研究如何以高效益地实现项目目标为目的,以项目经理负责制为基础,对项目按照其内在逻辑规律进行有效地计划、组织、协调与控制,以适应内部及外部环境并组织高效益的施工,使生产要素优化组合、合理配置,保证施工生产的均衡性,利用现代化的管理技术和手段,以实现项目目标和使企业获得良好的综合效益。……