仲庆干


摘 要:轻型井点降水法比较广泛使用于基坑降水工程,通过降水施工可将基坑的原地下水位降至基坑坑底以下,使基坑保持干燥状态,从而可以改善施工条件,保证基坑的稳定和安全。本文主要从工艺原理、施工方法、质量要求等方面叙述了人工冲孔轻型井点在太仓市规划馆工程基坑降水工程中的应用。
关键词:人工;井点; 基坑; 降水
Abstract: the light well point precipitation method widely used in foundation pit engineering, through construction foundation pit precipitation may be the original underground water level to the foundation pit excavation bottom following, keep dry state, which can improve the construction conditions, guarantee the stability and safety of foundation pit. This article mainly from the technological principle, construction method, quality requirements and other aspects of artificial punching light well point in Taicang city planning exhibition hall engineering dewatering of foundation pit engineering.
Key words: artificial well point dewatering of foundation pit
太仓市规划馆工程位于太仓市南郊科教新城江申大道、平治路交叉处,天镜湖的西南侧,总建筑面积18545平方米。规划馆主馆地上三层、地下一层;地下一层(汽车库、设备用房)、地上三层(中间设有三层通高的中庭,一层为中心模型展区;二层为专项成果展示区;三层为人防展区和展馆内办公区);
该工程主馆设计为一层地下室,基坑实际开挖深度为2.9m,虽然没有达到住房和城乡建设部《关于印发〈危险性较大的分部分项工程安全管理办法〉的通知》(建质[2009]87号)文件规定的深基坑标准,但由于到工程建在天镜湖的湖畔,而且60%的施工区域都是回填而成的,为防止基坑开挖后湖水的渗入,施工总承包单位对本工程基坑的施工考虑了双轴搅拌桩止水帷幕结合人工冲孔轻型井点降水、边坡挂网喷浆的施工工艺。
根据本工程的土层情况及开挖深度分析,本工程的地下室基础在地质报告标注的第三层土下部,该土层的土质大多为灰色粉质土,流塑性,含水量较高(W=42%),孔隙比大(e=1.2左右),土的强度低,灵敏度高,渗透……