深基坑变形监测技术分析与应用

2017-06-21 17:29:20郝晓东
中华建设科技 2017年4期

郝晓东

【摘要】以某深基坑支护结构的监测情况为案例,分析了其水平位移、周围建筑的沉降、锚杆的预应力损失及地下水位的变化情况,并分析研究了基坑监测结果,针对监测结果采取相应预防措施,充分采用了信息化施工方法,有效地保证了基坑施工及周围建筑物、构筑物及道路管线的安全。

【关键词】深基坑工程;变形监测;支护结构;信息化施工

Analysis and application of deformation monitoring technology for deep foundation pit

Hao Xiao-dong

(Hohhot Urban Rail Transit Construction Management Co., LtdInner MongoliaHohhot010020)

【Abstract】In supporting structure for deep foundation pit monitoring as a case study, analysis of the horizontal displacement, the settlement of the surrounding buildings, the anchor pres-tress loss and groundwater level changes, and analysis of monitoring results of the foundation pit, according to the monitoring results to take preventive measures, the full use of information technology construction method, effective to ensure pipeline safety and road construction of foundation pit and surrounding buildings and structures.

【Key words】Deep foundation pit engineering; Deformation monitoring; Supporting structure; Information construction

随着城市现代化进程的加快,高层、超高层建筑竞相发展,随之而来的深基坑工程越来越多,其开挖深度也越来越深。由于深基坑工程施工期(自基坑开挖至基坑回填)较长、施工场地狭窄、受自然气候、复杂的工程地质条件等因素影响大,所以深基坑施工往往施工条件差、安全隐患很大。为了减少外部因素对支护结构的工作状态和基坑的稳定性带来不利的影响,消除安全隐患,在基坑开挖过程中,应对周边环境安全信息(房屋沉降、房屋倾斜及裂缝、地面沉降)、基坑边坡稳定信息(顶部垂直及水平位移、土体位移)、地下水位动态变化信息进行监测。为了准确地掌握基坑特别是深基坑工程在施工过程中的变形情况,需从基坑主体结构、围护结构、地下水位和相邻环境等诸多方面对基坑进行全面的变形监测。

1. 工程概况

(1)该项目拟建高171米。总建筑面积:268214.4m2。设5层地下室,地下室开挖深度-21米。建筑主体组合成L型布局,通過底部五层裙楼将主体建筑连接为一整体。1、2号办公楼与3号楼(办公及酒店)在造型上结合成一体,1、2号办公楼地面40层,3号楼(办公及酒店)45层。……