建设工程施工招标阶段造价控制

2017-07-20 16:28:39倪俭
建筑科技与经济 2017年7期
关键词:图纸施工

倪俭

摘 要:施工招标阶段是业主选择理想承包商,约定理想合同价的关键环节。该阶段的造价控制具有事前性、主动性、四两拨千斤的效果,因此在该阶段通过工程量清单、招标控制价的定量制约和招标文件的定性制约来控制造价具有极大效用。本文基于施工招标阶段造价控制的背景及特性,根据施工招标流程提出影响造价的关键问题,并针对问题提出解决方法,从不同环节、方面进行造价控制。

关键词:施工招标阶段;造价控制

Abstract: The construction bidding stage is the owner choose the ideal contractor, agreed the key to the ideal of the contract price. The stage has a prior cost control, initiative, skillfully deflected the results, so at this stage by BOQ qualitative constraints tender price controls and quantitative constraints to control the cost of tender documents are of great utility. Based on the background and characteristics of construction bidding phase of cost control, according to the construction tender process cost impact of the key issues raised and propose solutions for the problem, perform cost control from different aspects, aspects.

Keywords: construction tender stage; Cost Control

1.施工招標阶段造价控制背景及特性

1.1造价控制思想

造价控制贯穿在建设工程的各阶段、各方面,通过全过程、全生命周期、全要素、全面造价控制等经典理论,可以看出造价控制思想侧重于建设工程两个维度,一是时间维度,如全过程、全生命周期造价控制;二是涉及领域维度,如全要素、全面造价控制。根据经典造价控制思想的提出角度,可以指导具体阶段及领域的造价控制工作。

1.2施工招标阶段造价控制特性

施工招标阶段造价控制,是侧重“时间维度”的造价控制概念,如果从“业主寻找承包商”角度来定义主要的工程交易,那么施工招标阶段意味着建设工程从非交易阶段进入交易阶段。该阶段的造价控制具有承前启后的作用,具有“主动性”、“事前性”,可谓“四两拨千斤”。

2.施工招标阶段造价控制存在问题

针对施工招标阶段造价控制在整个工程项目造价控制中具有“事前性”、“主动性”、“四两拨千斤”的特点,在该阶段实现造价控制必要而有效,因此,应当依据施工招标阶段中的流程分析出影响造价的关键问题。……

登录APP查看全文

猜你喜欢
图纸施工
后浇带施工技术在房建施工中的践行探索
后浇带施工技术在房建施工中的应用
土木工程施工技术创新探讨
浅谈汽车线束产品图纸管理
看图纸
当代工人(2019年20期)2019-12-13 08:26:11
模具图纸在全生命周期内的信息管理系统研究
土木工程施工实习的探讨与实践
扶贫村里施工忙
河南电力(2016年5期)2016-02-06 02:11:34
酒店室内装修图纸深化设计浅析
河南科技(2014年12期)2014-02-27 14:10:44
瓦勒里欧·奥加提 设计选例,图纸
世界建筑(2012年8期)2012-04-20 06:09:14