重力式码头基槽整平施工工艺及其质量控制

2018-07-18 11:30:40王学明陈俊
价值工程 2018年16期
关键词:质量控制

王学明 陈俊

摘要:本文是从沙特达曼港第二集装箱码头一期工程项目施工过程进行总结,简要的阐述了重力式方块码头基槽整平的施工工艺及质量控制要点。对基槽整平施工过程中的施工流程以及影响质量的因素进行简述,并且针对影响因素给出相应的解决方法,为以后类似的项目施工及质量控制提供参考。

Abstract: This paper summarizes the construction process of the first stage project of the second container terminal of Darman Port in Saudi, and briefly expounds the construction technology and quality control points of the foundation trench leveling of the gravity block wharf. This paper briefly describes the construction process and the factors affecting the quality of foundation trench leveling construction, and gives the corresponding solutions for the influencing factors, which provides a reference for the construction and quality control of similar projects in the future.

关键词:基槽整平;施工工艺;质量分析;质量控制

Key words: foundation trench leveling;construction technology;quality analysis;quality control

中图分类号:U215.14 文献标识码:A 文章编号:1006-4311(2018)16-0147-02

0 引言

重力式码头施工难点主要是水下部分施工。水下部分施工会受到多方面影响,比如:流速、水深、水下光线及施工作业人员经验等等,这些都使得重力式码头质量风险大大增加。水下基槽整平也是重力式码头水下施工的重要分项之一,它是承上启下的一个非常重要环节,基槽整平的质量会直接影响到整个码头的施工质量。

1 工程介绍

沙特达曼港第二集装箱码头一期工程位于与波斯湾的沙特阿拉伯东部省达曼港内,该项目主要工作包含了700m的重力式方块码头,基槽低宽13.75m,顶宽18m,左侧边坡坡度比为1:1,右侧边坡坡度比为1:2,基槽高度为1.5m,总开挖方量约为28万m3。基槽抛石分为1.45m的10~100kg基槽石和50mm的0~44mm整平石,上部结构为空心方块,其断面图如图1。

2 基槽整平施工工艺

本文重点对基槽整平进行阐述,基槽在开挖验收合格后进行基槽抛石打夯,打夯验收完成时即可进行基槽整平工作,基槽整平施工工艺如图2。

2.1 整平船舶定位

本项目整平船采用方驳定位船37#,船舶定位左舷顺着基槽方向进行定位,在定位船上采用长臂挖机进行辅助整平施工。……

登录APP查看全文

猜你喜欢
质量控制
如何加强土地测绘质量控制
射线无损检测在石油化工压力管道的质量控制
高层建筑主体结构施工技术及质量控制研究
浅析建筑工程施工管理
浅谈机车总风缸的制作质量控制
科技视界(2016年21期)2016-10-17 17:58:28
血型实验室的输血检验的质量控制与输血安全探究
沥青路面施工技术及质量控制
关于高层建筑施工技术要点以及质量控制的思考
浅析水利工程施工质量问题及质量控制措施
浅谈在公路桥梁施工环节的质量管理及控制
科技视界(2016年20期)2016-09-29 13:11:33