闫鑫
摘 要:随着我国经济建设的稳步发展,对于偏远地区的基础建设也日益被人们重视。对于偏远地区用电难的问题,虽然国家电网的建设正在逐步向偏远山区延伸,但是偏远地区地形较为复杂,建设难度高,投资成本大,设备的维护也比较困难,所以在短期内依靠国家电网的建设解决偏远山区人民用电难问题还是比较困难的。文章提出一种设想:可以在偏远地区的河床上安装水下涡轮机组,利用河流的动能进行发电。本研究将对这种发电方法的优点进行阐述,并对可能出现的问题提出可行的解决方法。
关键词:偏远地区;水下涡轮发电机;河流水力发电
中图分类号:TM31 文献标志码:A 文章编号:2095-2945(2018)20-0162-02
Abstract: With the steady development of our country's economic construction, people pay more and more attention to the infrastructure construction in remote areas. With regard to the problem of power shortage in remote areas, although the construction of the State Grid is gradually extending to remote mountainous areas, the terrain in remote areas is relatively complex, the construction is difficult, the investment cost is high, and the maintenance of equipment is also relatively difficult. Therefore, in the short term, it is difficult to rely on the construction of the State Grid to solve the problem of the people in remote mountain areas. This paper presents an idea that underwater turbine units can be installed on the riverbed in remote areas to generate electricity using the kinetic energy of the river. This study will describe the advantages of this method and put forward feasible solutions to the possible problems.
Keywords: remote area; underwater turbine generator; river hydropower
1 研究背景
近些年來随着经济水平的日益发展,我国各项建设项目正稳定快速的发展。然而对于偏远山区的基础设施建设,是我们国家进行脱贫攻坚战,实现全面建设小康社会的关键而又不可或缺的重要一步。
中国农村面积广大,人口6714.5万人,占全国总人口的50.32%。作为农村最重要的基础设施之一,电力与中国农村居民的基本生活需求,生活水平和经济可持续发展密切相关[1]。“九五”期间,中国在农村电网改造上投入2000多亿元,解决了农民用电超过80%的问题,为改善我国农村形象发挥了重要作用。但是,许多农村地理位置偏远,自然环境相对较差,电力消费问题尚未解决,全民电力服务的重点和难点在西部农村地区[2]。虽然国家电网的建设正在逐步向偏远山区延伸,但是偏远地区地形较为复杂,建设难度高,投资成本大,设备的维护也比较困难。……