【Abstract】This paper analyzes the head characteristics of a dam-type development hydropower station, and proposes the minimum operating water level requirement for power generation. On this basis, the rated head of the power station is determined through technical and economic comparison of multiple schemes. Through the research of the article, it provides an empirical reference for the selection of the rated head of the same type of hydropower station.
【Key words】Power station;Water head;Analysis
1. 基本概況
某水利枢纽工程主要承担灌溉、防洪任务,兼顾发电。水库正常蓄水位1700m,相应库容11.48亿m3,死水位1590m,死库容1.26亿m3,调节库容10.22亿m3。电站采用堤坝式开发,利用落差220m。电站装机容量750MW,装设三台等大机组,单机容量250MW。电站保证出力45MW,多年平均年发电量19.28亿KW.h。
2. 发电最低运行水位选择
(1)水库正常蓄水位1700m相应最大水头221.3m,正常蓄水位至死水位1590m水位差110m,水库最大消落深度达50%,超出水轮机组运行范围。结合水轮机技术水平,提出机组运行最大消落深度按照30%左右控制,在此基础上,针对电站发电最低运行水位拟定了1629m、1634m、1639m三组方案进行比较,各方案特征指标见表1。
(2)上述拟定各方案对工程灌溉及防洪均不产生影响。从动能指标来看,方案1到方案3随着最低发电运行水位抬高,方案间电量呈递减趋势,其中方案1和方案2多年平均年发电量相对较大;从机组运行稳定来看,最低发电运行水位越高,电站发电最大消落深度越小,对机组稳定运行越有利,三组方案中方案2和方案3相对较优;从各方案投资来看,方案1到方案3随着最低发电运行水位抬高,工程投资呈递减趋势,但变化幅度不大;从不同方案经济指标来看,各方案经济净现……