掘进工作面的注水防尘技术应用

2020-05-19 05:11:37张鹏
河南科技 2020年8期

张鹏

摘 要:为了解决掘进面突出煤层降尘难的问题,笔者采用现场试验和科学分析相结合的方法,在某煤矿综掘工作面进行了试验研究。首先测定突出煤层煤体的湿润半径,其次在突出煤层中设计了若干深20 m、直径75 mm的注水钻孔,注水压力为3.5~4.5 MPa,持续时间为2 h,然后取芯进行湿润效果检验。研究结果表明,在掘进进尺8.0 m处,注水降尘效果最佳,与注水前相比,注水后呼吸性粉尘有所下降,作业环境明显改善。

关键词:掘进工作面;注水降尘;润湿效果;呼吸性粉尘;粉尘浓度

中图分类号:TD714文献标识码:A文章编号:1003-5168(2020)08-0086-02

Application of Water Injection and Dust Prevention Technology in Driving Face

ZHANG Peng

(China Coal Technology and Engineering Group Chongqing Research Institute, Chongqing 400039)

Abstract:  In order to solve the problem of difficulty in dust reduction of the coal seam in the heading face, the author carried out experimental research on a comprehensive mining face in a coal mine by using a combination of field tests and scientific analysis. First, the wetting radius of the coal seam of the outburst coal seam was measured, secondly, several water injection boreholes with a depth of 20 m and a diameter of 75 mm were designed in the outburst coal seam, the injection pressure was 3.5~4.5 MPa and the duration was 2 h, then the coring was tested for wetting effect. The research results show that the effect of water injection and dust reduction is the best at the 8.0 m advancing distance, compared with before water injection, the respirable dust decreases after water injection, and the working environment is significantly improved.

Keywords: driving face;water injection dust reduction;wetting effect;respiratory dust;dust concentration

煤层注水降尘效果影响因素众多,而注水参数是主要影响因素之一[2-6]。注水参数主要包括注水壓力、注水速度、注水量和注水时间[7]。为了使突出煤层达到良好的煤层注水降尘效果,本文对突出煤层的煤层注水工艺进行了试验研究。

1 注水工艺

为了分析突出煤层的湿润效果,在巷道右帮距迎头5 m处打直径75 mm的钻孔(见图1),注水时间为2 h,现场注水压力为3.5~4.5 MPa,随后以该钻孔为圆心,在其内侧每隔0.5 m进行打钻,其钻孔布置如图1所示,取打钻2 m后的钻屑进行水分含量测定,用以判断注水后的湿润效果。

经测量,得到不同位置处的含水量图,如图2和图3所示。随着检验孔距注水孔距离(0.5~3.0 m)的增加,钻屑的煤粉含水量逐渐降低。随着检验孔深度的增加,钻屑的煤分含水量呈先增加后逐渐降低的趋势,检验孔距注水孔8 m时,钻屑的含水量达到最大值(3.60%)。因此,在该试验条件下,煤尘注水湿润半径为2.0~2.5 m。……