徐敬业 徐林荣 张亮亮



摘要:高速公路低路堤受到路基高度的限制,容易產生工后沉降过大或不均匀沉降等问题。路基设计和养护规范中均未针对低路堤设计进行统一规定,导致低路堤在建设期、运营期存在影响工程正常使用的问题。借鉴地质灾害风险评估理论,分析干湿循环、交通荷载等影响因素,考虑养护维修对各因素进行修正,提出了低路堤路基服役状态评估方法。该方法运用模糊综合评价法和物元分析方法分析建设期结构质量易损性、运营期路基危险性及养护维修修正值,得出低路堤路基综合风险度。将该方法运用于浙北低路堤段工程实例,得到的综合风险度为低度,服役状态风险程度与现场调查结果基本一致,说明了该评估方法的可行性。
关键词:高速公路;路堤;路基;服役状态;风险评估
中图分类号:U416.1 文献标志码:A 文章编号:20966717(2020)04003608
收稿日期:20191115
基金项目:国家自然科学基金(51778634)
作者简介:徐敬业(1972 ),男,高级工程师,博士生,主要从事岩土工程研究,Email:837088296@qq.com。
徐林荣(通信作者),男,教授,Email:lrxu@csu.edu.cn。
Received:20191115
Foundation items:National Natural Science Foundation of China (No. 51778634)
Author brief:Xu Jingye(1972 ), senior engineer, PhD candidate, main research interest: geotechnical engineering, Email: 837088296@qq.com.
Xu Linrong (corresponding author), professor, Email: lrxu@csu.edu.cn.
Risk assessment of expressway lowembankmentsubgrade in service status
Xu Jingye a, Xu Linrong a,b, Zhang Liangliang a
(a. College of Civil Engineering; b. National Engineering Laboratory of Highspeed Railway Construction Technology, Central South University, Changsha 410075, P. R. China)
Abstract: The low embankment of the expressway is limited by the height of subgrade, and some special problems such as excessive settlement or uneven settlement are easily caused after construction. At present, the subgrade design and maintenance codes do not uniformly regulate the design of the low embankment, resulting in many problems that would affect the normal use of the structure during the construction and operation of the low embankment. Based on the risk assessment theory of geological disaster, this paper analyzed the effect of some factors such as drying and wetting cycle as well as traffic load on the low embankment of the expressway. In addition, considering the maintenance and repair, these factors were modified and the evaluation method of lowembankmentsubgrade in service status was proposed. Combined with fuzzy comprehensive evaluation method and matterelement analysis method, the structural quality vulnerability in construction period, the risk of subgrade in operation period and the modified value of maintenance and repair were analyzed. And then the comprehensive risk of lowembankmentsubgrade was obtained. The method was applied to a low embankment project in northern Zhejiang. The result shows that the comprehensive risk is low and the service state risk is basically consistent with the filed survey result, which illustrates the feasibility of the proposed evaluation method.
Keywords:expressway; embankment; subgrade; service status; risk assessment
高速公路广泛采用高路堤(>2.5 m)设计方案,但采用高路堤会增大土石方工程量,而且在软土地基广泛分布的东南沿海地区,高路堤方案会出现路基不均匀沉降引起的纵横向开裂、整体或局部下沉、路基滑坡或边坡坍塌等问题[1],因此,提出了高速公路低路堤的设计理念与方案。低路堤设计在高速公路建设中逐步得到推广应用,如山东省济青高速、河南省商开高速部分路段,均采用低路堤设计方案,取得了较好的社会经济效益。高……