摘要:人工假底的稳定性是下向进路充填法安全高效开采的关键,文章以云南某铅锌矿为工程背景,为了确保开采过程中的安全,提高矿体回收率,应用弹性力学理论、薄板问题,建立人工假底力学模型,对该矿1880~1964m中段氧化铅锌矿回采过程中人工假底的稳定性进行理论计算分析。研究结果表明,该矿采用全进路胶结充填,人工假底能够保证回采期间的安全和稳定。
Abstract: The stability of artificial false bottom is the key to safe and efficient mining by downward filling method. This paper takes a lead-zinc mine in Yunnan as an engineering background. In order to ensure the safety of mining process and improve the recovery rate of ore body, the mechanical model of artificial false bottom is established by applying elasticity theory and thin plate problem. The oxygen content in the mid-section of 1880~1964m of the mine is calculated. The stability of artificial bottom in the mining process of chemical lead-zinc mine is calculated and analyzed theoretically. The results show that the full-roadway cemented backfilling can ensure the safety and stability of the mining process.
关键词:膏体充填人工假底;进路充填法;力学模型;薄板问题
Key words: paste filling artificial base;approach filling method;mechanical model;thin plate problem
中图分类号:TD853.34 文献标识码:A 文章编号:1006-4311(2020)25-0165-03
0 引言
现代采矿技术中,大多数金属矿采用人工假底技术。人工假底技术是由长春黄金研究院于20世纪80年代初提出,在红花沟金矿实施了钢筋混凝土假底[1],该技术在促进金属矿山资源回收方面起到显著作用。随着地表开挖工程与日俱增,不断揭露出的矿山工程岩体特征复杂多变,给顶底板支护以及加固维护等造成极大困难,顶底板破碎塌陷特征愈加受到工程技术人员的重视,为此大量研究人员对此展开了许多卓有成效的研究,即人工假底的应用现状、力学计算和稳定性分析。
在现代采矿技术中,众多矿山使用人工假底包括钢筋混凝土假底、钢结构假底、膏体充填假底、坑木假底、钢筋网柔性隔离假底等5种类型。目前,部分学者对人工假底的设计和稳定性分析考虑已展开研究,岩体结构受应力环境开挖扰动等因素影响极其复杂,如周磊、王欢等[2]利用数值模……