郭伟刚






摘 要:在后张法预制箱梁施工中,在预应力张拉及压浆节段经常存在压浆不饱满、张拉断丝滑丝、张拉力不足以及伸长值超过规范要求等质量问题,往往是由于作业人员未按方案和规范要求执行、未严格落实设置的质量控制关键点落实等。为有效避免这类问题,有必要对施工技术要点进行探讨。
关键词:后张法;预应力;张拉;压浆
中图分类号:U445.1 文献标识码:A 文章编号:1003-5168(2021)22-0085-03
Abstract: In the construction of post-tensioned precast box girder, there are often many quality problems in the pre-stressed tensioning and grouting sections, such as insufficient grouting, broken silky wires, insufficient tension, and elongation values exceeding specifications Request etc. The reason is often that the operators did not implement the plan and specifications, and did not strictly implement the key points of the quality control set. In order to effectively avoid such problems, it is necessary to discuss the key points of construction technology.
Keywords: post-tensioning method;prestressing;tensioning;grouting
甘肅省临夏市城东五路跨线桥标准段桥宽为17 m,加宽段桥宽为21.00~28.62 m,采用双向4车道。横断面布置为0.5 m(防撞护栏)+0.5 m(路缘带)+3.5 m(机动车道)+3.25 m(机动车道)+0.5 m(路缘带)+0.5 m(防撞护栏)+0.5 m(路缘带)+3.25 m(机动车道)+3.5 m(机动车道)+0.5 m(路缘带)+0.5 m(防撞护栏);桥跨布置形式为4×35 m+(31+32+32) m+(30+30+27) m+4×35 m+3×35 m,全桥长为570.6 m。本桥采用整幅布置,跨路口处为(31+32+32) m+(30+30+27) m变宽度预应力混凝土现浇连续箱梁,两端引桥采用35 m预制小箱梁。在该项目实施过程中,为解决压浆不饱满、张拉断丝滑丝、张拉力不足、伸长值超过规范要求等质量问题,重点从原材料检验、预应力筋下料及穿束、预应力筋张拉、压浆及封锚等多个方面进行预应力施工质量控制。经过该项目的实践证明,这一质量控制方法行之有效,能大幅提高预应力施工质量。
1 施工技术要点
1.1 原材料检验
后张法预应力施工的原材料主要有钢绞线、水泥及外加剂、锚具、夹具和波纹管等。原材料进场后,应检查其质量证明文件、外观、尺寸和力学性能等,并分门别类存放,同时还应报监理工程师并见证取样送检。
1.1.1 钢绞线。钢绞线应按不超过60 t为一个检验批。……