摘要:针对强夯机夯能效率难以测试的问题,开发出一种新的测试方法,即通过测试强夯机夯锤下落过程中的加速度,再对加速度积分得到夯锤落地速度和夯高,进而计算得到强夯机夯击能效率。这种方法简单方便,结果可靠,可作为强夯机夯击能效率测试的标准手段。

Abstract: A new testing method of dynamic compactor,s tamping energy efficiency was developed. With this method, the acceleration of rammer during the falling which is integrated for velocity and height, is tested firstly, and then the tamping energy efficiency can be calculated with velocity and height. This method is uncomplicated and convenience, and the testing result is accurate, it can be the standard way of testing tamping energy efficiency.

关键词:强夯机;夯击能效率;加速度

Key words: dynamic compactor;tamping energy efficiency;acceleration

中图分类号:N34                                      文献标识码:A                             ;   文章编号:1674-957X(2021)06-0076-02

0  引言

强夯机是一种用于土石方填平后夯实工程的机械设备,是基于强夯法原理设计的工程机械。强夯机按夯锤下落方式可分为脱钩式和非脱钩式两种。前者通过脱钩装置使夯锤与吊钩脱离,实现自由落锤,进行下一次的落锤前,需要通过人工挂钩。后者的夯锤无论提升还是下落都是通过提升钢丝绳始终与强夯机的提升机构连接,实现带载高速落锤[1-4]。与前者相比,非脱钩式强夯机操作方便,无需人工挂钩,作业效率高,节省施工成本,但技术复杂,夯能损失较大。若能通过试验得到夯擊能效率,进而指导设计提高夯击能利用率,对非脱钩式强夯机产品的性能提升具有重要意义。强夯机自由落钩过程时间极短,运动状态很难把握,其夯击能效率难以准确测量。此前我司曾利用高速摄像机拍摄视频,再采用视频分帧软件进行分帧以得到准确的自由落钩时间,进而计算得到夯击能效率。这种方法采用视频分帧的方式求取自由落钩时间,其下落的起始帧和结束帧难以选取,导致误差极大,所以,这种方法只能用于夯击能效率的初步估算。……