基坑近接既有地铁隧道的施工工序研究

2025-07-13 00:00:00郭继杰张潇丽李大勇顾永财
天津建设科技 2025年3期
关键词:变形施工

【DOI编码】:10.3969/j.issn.1008-3197.2025.03.006

Research on Construction Procedure of Foundation Pit Adjacent to Existing Subway Tunnel

GUO Jijie',ZHANG Xiaoli²*,LI Dayong',GU Yongcai² (1.JinanRailTransit GroupCo.Ltd.,Jinan25o14,China;2.ChinaRailwaySixth SurveyandDesignInstituteGroupCo.Ltd. Tianjin ,China)

【Abstract]:Inorder to mitigate the impactof foundation pit excavation on existing tunnels,a case studywas conducted on afoundation pit adjacent to the Jinan Metro Line 2.Through numerical simulation analysis,the influenceof three excavation processes (layer-by-layer,section-by-section,and combined layer-section)on tunnel vertical displacement was systematically investigated.Comparative analysis demonstrated that the layer-section excavation method exhibited the leastimpact on tunnel deformation andaxial force,validated byboth numerical simulation and field monitoring data.

【Key words】: foundation pit;tunnel;excavation and unloading;construction process

随着我国地下空间开发进程的加快,基坑近接既有地铁隧道的案例越来越多。开挖卸载打破了原有土体的应力平衡,使基坑周围土体在不平衡力作用下产生变形和位移,从而使既有隧道承载能力下降甚至产生较大变形,影响行车安全;因此采用合理施工工序来减小隧道变形的研究具有重要意义。

目前国内外学者对基坑开挖引起下卧隧道上浮的变形控制措施进行了大量研究。郭鹏飞等2、王晓华等等研究了基坑形状、卸荷比、开挖面积等对隧道竖向位移的影响,结果表明基坑开挖深度、面积、卸荷比越大,隧道顶部埋深越小引起隧道竖向位移越大。刘波等、赵朋、高强等、郑刚等-陈福斌等吴怀娜等通过数值模拟或工程实测等表明坑内土体加固、堆载回压、施打抗浮桩等措施均可减小基坑开挖对既有隧道的影响。

上述研究大多针对采用主动加固措施的联合控制方法,对仅采用施工工序控制隧道变形并通过现场实践加以验证的相关研究较少。本文以市某管道基坑上跨地铁2号线工程为例,基于分层、分段开挖思想,提出3种不同的基坑施工工序,通过基坑开挖引起隧道位移和内力分析,对其施工安全性进行评价,选取最优方案。通过实测数据与计算数据相互验证,说明研究结果的正确性。

1工程概况

1.1 基坑

拟建管道项目上跨地铁2号线某盾构区间隧道,与地铁线路夹角约 80∘ ,交叉段管道采用开挖预埋保护涵方式穿越。……

登录APP查看全文

猜你喜欢
变形施工
后浇带施工技术在房建施工中的践行探索
后浇带施工技术在房建施工中的应用
土木工程施工技术创新探讨
谈诗的变形
中华诗词(2020年1期)2020-09-21 09:24:52
“我”的变形计
会变形的饼
土木工程施工实习的探讨与实践
扶贫村里施工忙
河南电力(2016年5期)2016-02-06 02:11:34
变形——出发
学与玩(2005年3期)2005-04-29 00:00:00