泥岩隧道的开挖施工技术研究

2012-04-10 04:59:40布新功
城市建设理论研究 2012年6期
关键词:围岩混凝土施工

布新功

摘 要: 合理有效的开挖施工技术是确保泥岩隧道施工的一个值得研究的关键施工技术问题,结合某泥岩隧道的开挖施工实例,通过开挖施工方案对比,介绍三台阶七步开挖技术在泥岩施工中的优势,详细分析了三台阶七步开挖技术的施工工艺、施工技术等;开挖施工完成后的监测结果表明,三台阶七步开挖技术在泥岩隧道开挖施工中具有可行性,可有效地缩短开挖施工工期,具有良好的安全性与经济性,该开挖施工技术可为同类隧道的开挖施工提供参考借鉴。

关 键 词:泥岩隧道三台阶七步开挖法开挖技术施工技术

中图分类号:TU74文献标识码:A 文章编号:

Abstract: Reasonable and effective excavation construction technology is to ensure that the mudstone tunnel construction is a worthy research key construction technology, combined with a mudstone tunnel excavation construction examples, through excavation scheme comparison, the three step seven step excavation technology in mudstone construction advantage, a detailed analysis of three step seven step excavation technology, construction technology construction technology of excavation; after the completion of the monitoring results show that the three step, seven step excavation technology in mudstone tunnel excavation construction has feasibility, can effectively shorten the excavation construction time limit for a project, has good safety and economy, the excavation construction technology for similar tunnel excavation construction provides the reference.

Key Words:Mudstone tunnel; The three step and seven step excavation method; Excavation technology; Construction technology.

1引 言

目前国内高速公路发展迅猛,丘陵地区中大量建设有短隧道,而且短隧道大部分为浅埋、偏压,围岩条件差,一般为土质岩层,土质遇水易泡软,容易造成泥岩隧道出现垮塌,这给快速、安全施工带来难度。对于泥岩隧道来说,合理有效地开挖施工是确保泥岩隧道施工中不造成塌方的一个有效方法,可想而知,泥岩隧道的开挖方法以及施工技术是一个值得研究的问题。鉴于此,本文结合某泥岩隧道工程的开挖施工,对各开挖施工方案进行对比,探讨适合泥岩隧道开挖的施工方案,同时分析该开挖施工方案的施工工艺以及关键施工技术,旨在为同类泥岩隧道工程的开挖施工提供参考借鉴。

2工程概况

某泥岩隧道起标为DK274+745,终标为DK274+925,隧道全长为180米,为双线泥岩隧道。……

登录APP查看全文

猜你喜欢
围岩混凝土施工
混凝土试验之家
现代装饰(2022年5期)2022-10-13 08:48:04
关于不同聚合物对混凝土修复的研究
土木工程施工技术创新探讨
混凝土预制块模板在堆石混凝土坝中的应用
隧道开挖围岩稳定性分析
中华建设(2019年12期)2019-12-31 06:47:58
混凝土,了不起
软弱破碎围岩隧道初期支护大变形治理技术
江西建材(2018年4期)2018-04-10 12:37:22
土木工程施工实习的探讨与实践
扶贫村里施工忙
河南电力(2016年5期)2016-02-06 02:11:34
采空侧巷道围岩加固与巷道底臌的防治