孙子钧
摘要:佛山某泵站在汛期泵房进水前池发生管涌破坏。本文通过有限元计算对强透水地基泵站,进水前池管涌发生的原因进行分析,并对不同位置的减压井布设方案的降水效果进行比较,计算表明:进水前池前侧布井降水效果优于后侧布井方案,内侧布井方案降水效果优于外侧布井方案。
关键词:强透水地基;进水前池;渗流;减压井布置位置
Abstract: a pump station in flood season in foshan water pump room before happened pool destruction of the piping. This article through the finite element calculation of strong water foundation pump station, before the water piping pool happened analysis of the causes, and to different locations of the relief Wells layout scheme comparison of precipitation effect, calculations show that: water pool well before the side effect is better than that of precipitation cloth behind cloth well scheme, inside cloth precipitation effect is better than that of the lateral Wells scheme cloth well scheme.
Keywords: strongly permeable foundation; Before the water pool; Seepage; Reducing pressure Wells decorate position
中图分类号:TV675文献标识码:A文章编号:
1引言
某泵站位于佛山市禅城区,濒临吉利水道。泵站建设时,为了施工止水方便,在拦污栅处设置了防渗截墙,并在泵室进口前池-4.21m水平段内设置了3个采用反滤及格网处理的预留孔作为集水井。2008年汛期,泵站前池拦污栅护坦与斜坡顶接缝处出现两处管涌,采用反滤砂石料及砂包填压度汛后,清除填压砂石料发现护坦和斜坡段底板上抬,3个集水井均出现管涌,清理时有水带砂涌出。
本文通过有限元计算对强透水地基泵站进水前池管涌发生的原因进行分析,并对不同的减压井布设方案进行比较,给出较为合理的抗渗加固方案。
2地质条件
泵站场址在地貌上属于珠江三角洲冲积平原腹地,地形平坦开开。场地之地基由人工填土(Qs)、第四系三角洲海陆交互冲淤积层(Qmc)组成。
(1)人工填土(Qs)
筑填土:多为人工筑填的堤身上,层厚1.5~9.8m。筑填土呈黄褐色、灰褐色、灰白色、褐红色等,由粉细砂、粉质粘土、粉土等组成。
(2)第四系三角洲海陆交乎相冲淤层(Qmc)
第四系三角洲海陆交互冲淤积层主要由不同粒级砂土、淤泥质土、粉质粘土等组成。……