市政给排水工程的质量控制与管理分析

2014-07-18 15:28:35阮岩
中华建设科技 2014年4期
关键词:质量通病处理措施质量管理

阮岩

【摘要】市政给排水工程是城市市政设施得以正常使用的重要设施之一,工程质量的优劣不仅影响城市功能的充分发挥,而且对道路完好、城市环保以及城市防洪排涝等都有直接的影响。本文结合多年的现场经验,从施工准备、现场管理、质量通病及处理措施三个方面分析了市政给排水工程的施工质量控制要点和措施。

【关键词】质量管理;质量通病;处理措施

【Abstract】Municipal water supply and drainage engineering is one of the important facilities in normal use to city municipal facilities, give full play to the project quality not only affects the city function, but also has a direct influence on the road condition, city environment and city flood control and drainage etc.. In this paper, based on the experience of many years, from the three aspects of construction preparation, problems and treatment measures of quality management, analyses the municipal construction quality control points and measures of drainage works.

【Key words】Quality management;Quality problems;Measures

1. 施工准备阶段

1.1熟悉图纸:施工人员只有熟悉了图纸,结合图纸掌握了排水管线的长度、坡度、走向、管材直径、井位数以及与施工区域有关的地形、地貌、地物等情况,才能在施工过程中有条不紊地应对一切突发事件。

1.2测量放线:施工前要认真按照施工测量规范和规程进行交换桩复测与保护,不得擅自变更,防止出现产生积水甚至倒坡现象,遇到建筑物须避让时,需出具设计变更。

2. 施工现场管理

2.1沟槽开挖、支护、垫层。

2.1.1在开挖前摸清地下原有管道、电缆和其他构筑物的位置,将调查结果和处理方案送交业主和相关管理单位确认,以便采取相应的保护、迁移或设计变更等措施,保证开挖顺利进行。

2.1.2在沟槽开挖过程中,及时做好管道基础施工准备,不使沟底土基暴露时间过长,造成不必要的损失。

2.1.3混凝土基础第一次浇筑成水平形状,待安管后再浇管座。混凝土用插入式振动器振实后,再用平板式振动器振平及抹平,基础浇筑完毕后2h内不得浸水,并及时进行养护。

2.2管道安装。……

登录APP查看全文

猜你喜欢
质量通病处理措施质量管理
浅谈建筑工程防水渗漏质量通病的防治
市政给排水管道工程施工中常见质量通病分析
居业(2016年9期)2016-12-26 21:53:10
加强住宅工程质量管理的对策思考
一千瓦电视发射机常见故障及处理措施
浅析三门核电厂设备冷却水系统运行失效和处理措施
科技视界(2016年18期)2016-11-03 20:26:45
青海油田尕斯第三采油作业区管道结垢影响因素及治理方法
建筑工程混凝土结构质量通病的成因分析
浅谈我企业如何推动QC小组活动
高低压配电设备常见故障与处理之我见
基于项目管理的企业年度重点工作管理
中国市场(2016年36期)2016-10-19 04:22:24