地震地磁场野外观测同步控制系统研制与应用
闫计明1,2, 王新胜1,2, 杨世英1,2
(1.山西省地震局太原基准台,山西 太原030025; 2.太原大陆裂谷动力学国家野外科学观测研究站,山西 太原030025)
摘要:针对地震地磁野外观测的需求,开发研制了一种基于无线网络的野外同步观测系统。该系统主要由接口单元、采集控制(CPU)单元、无线单元、传输网络、计算机控制中心等组成。该系统操作简单,实用性强,具有远程唤醒及休眠、校时等服务功能,也可应用到地磁台阵的数据传输与同步工作中。
关键词:地磁观测; 系统研制; 数据传输
收稿日期:*2014-06-09
基金项目:山西省科技基础条件平台计划项目(20120910050103)
作者简介:闫计明(1968-),男(汉族),天津宝坻人,高级工程师,主要从事台站管理及地震电磁观测资料的应用研究.E-mail:jimiyan@163.com
中图分类号:P318.6文献标志码:A
DOI:10.3969/j.issn.1000-0844.2015.01.0280
DevelopmentandApplicationofaSynchronousControl
SystemtoSeismo-geomagneticFieldObservations
YANJi-ming1,2,WANGXin-sheng1,2,YANGShi-ying1,2
(1.Taiyuan Reference Seismological Station,Earthquake Administration of Shanxi Province,
Taiyuan,Shanxi030025,China; 2.State Key Observatory of Shanxi Rift System,Taiyuan,Shanxi030025,China)
Abstract:The application of geomagnetic measurements is mainly focused in two areas.The first is scientific research,national defense,and national economic and social development,such as mineral exploration.The second is to serve earthquake monitoring and prediction.Seismo-geomagnetic field measurements are regularly repeated measurements at several points in the field using a high-precision magnetometer.The purpose behind taking such measurements is to research the temporal change and spatial distribution of the local geomagnetic field before and after earthquakes.In the field,a survey grid or line is used for obtaining geomagnetic observations,the spatial coverage of which is generally not less than 150 km×150 km for a survey grid and not less than 200 km for a survey line.In addition,the distance between measuring points is usually 5~40 km.For the measurement of total local geomagnetic intensity using mobile observations,two survey pegs (main and vice) were installed at field observation points.These observations were synchronized with a station that records the diurnal geomagnetic variation using a specialized instrument installed under the same conditions as for high-precision magnetic measurements.The purpose of this was to reduce or eliminate short-period and diurnal variations (Sq) of the geomagnetic field.After the Xingtai Earthquake (1966),mobile seismo-geomagnetic observations were initiated.Different from global geomagnetic measurements,the observation stations were generally set in earthquake regions or around active faults.Moreover,the repeated period of measurement was relatively short,i.e.,usually four times per year.However,irrespective of the form of measurement,a manual method for synchronizing the observations from the measuring stations in the field with the diurnal stations is necessary.Single independent magnetometers in the field cannot transmit data from the diurnal stations to the scene of the field observations in real time;therefore,the final data processing cannot proceed in a timely manner.Furthermore,data observed in the field and at the diurnal stations cannot be highly synchronized,which greatly affects the precision of the results and the efficiency of the fieldwork.In the current circumstances,the observation results and the report of the seismic regime are generally submitted 1~3 days after an earthquake,following which,many more days are required to obtain the observational data and to generate the reports.This is far from adequate for meeting the requirements of observations and field monitoring in the case of an emergency.Therefore,the development of a synchronous control system of seismo-geomagnetic measurement in the field is of great significance.A synchronous observation system with a wireless network was developed according to the requirements of seismo-geomagnetic field observations.The system consisted of an interface unit,data acquisition control unit (CPU),wireless unit,transport network,and computer control terminal.This system is easy to operate,practical,and will in time transfer data measured by the mobile geomagnetic diurnal stations and the field measuring points.The system has service functions such as remote wake-up,hibernating,and time correction.Overall,the system could reduce the field workload of observers,increase the working efficiency of field measurements,and could be used for the transmission of observations from the geomagnetic array.
Keywords:geomagneticobservation;systemdevelopment;datatransmission
0引言
地磁学是一门观测科学,没有大量的、长期的、连续的观测资料,地磁研究就是无源之水,无本之木[1]。地磁测量的应用主要有两个方面:一是用于科学研究、国防以及国民经济和社会发展。二是服务于地震监测预报。流动地震地磁观测开始于1966年邢台地震之后,其不同于全球地磁的测量,主要是其测量布点方式更具有特殊性和局部性,观测点一般布设于地震多发区及断裂带周围,复测周期相对短,一般为每年4期。但无论是服务于哪种形式的测量,都停留在野外测点和日变站同步观测的人工方式上。由于观测数据的传输和数据处理方法的问题,研究人员往往是数天乃至数月才可以看到全部的观测数据,远远不能适应地震预报和科学研究的需要。……