【摘要】随着高原水电工程的不断修建,由于高技能工人欠缺,地域昼夜温差大,气候干燥,日照强烈等环境气候影响,厂房框排架填充墙抹灰工程存在裂缝、空鼓、平整度差等问题。针对以上问题,对其产生的原因进行认真分析,研究防治措施,以完善高原地区框排架填充墙抹灰工程的施工质量,降低施工成本。
【关键词】高原;框排架;抹灰施工;质量通病;防治
【Abstract】With the continuous construction of Plateau hydropower project, due to the lack of skilled workers, large temperature difference between day and night, dry climate, strong sunshine and other environmental climate effects, there are some problems such as cracks, hollowing and poor flatness in frame-bent infill wall plastering engineering of factory buildings. In order to improve the construction quality and reduce the construction cost, the causes of these problems are analyzed and the prevention measures are studied.
【Key words】Plateau, frame bent, plastering engineering, common quality problems, prevention and cure
【DOI】10.12334/j.issn.1002-8536.2021.34.056
随着建筑节能技术的高速发展,越来越多的电站厂房采用了框、排架填充墙结构。这种结构墙体虽然具有自重轻、造价低等特点,但在高原地区施工工人技能水平不够,施工过程质量把控不严,再加上高原区域气候影响下,容易造成墙面表面开裂、空鼓、平整度差等问题,这些问题不会对结构安全构成威胁,但对建筑物外观及使用性造成影响。
1、工程概况
西藏DG水电站位于西藏自治区山南市桑日县境内,距拉萨市公路里程为263km。电站枢纽建筑物由挡水建筑物、泄洪消能建筑物、引水发电系统及升压站等组成。拦河坝为碾压混凝土重力坝,坝顶高程3451.0m,最大坝高117.0m,坝顶长389.0m。发电厂房采用坝后式布置,主要由主厂房、副厂房、变电站等组成,主厂房尺寸151.0m×29.00m×63.50m(长×宽×高),安装4台单机容量165MW的混流式水轮发电机组。
主、副厂房采用现浇钢筋混凝土框排架结构,建筑总高度为25.4m,建筑合理使用年限为50年,八度抗震設防,厂房墙体为填充墙,由灰砂砖砌筑而成。
2、框架填充墙质量通病成因分析
2.1表面裂缝
2.1.1发生的部位
抹灰工程完成一段时间后,裂缝较多出现在砖砌体与框架梁、柱的连接处以及现浇排架梁、柱表面。……