唐石华
摘要:施工是形成工程项目实体的过程,也是决定最终产品质量的关键阶段。工程项目施工涉及面广,是一个极其复杂的过程,影响质量的因素很多,如设计、材料、地质、水文、气象、施工工艺、技术措施、管理制度等,均直接影响着工程项目的施工质量。本文从水利施工控制的主要内容出发,分析了水利工程施工质量控制措施,并提出了水利工程施工过程中应注意的一些问题。
关键词:水利工程; 施工控制; 质量监督;质量控制
Abstract: Construction is the process of forming the project entity, and also the critical stage that finally determines the product quality. It involves a wide range and is an extremely complex process with multiple quality influence factors, such as design, materials, geology, hydrology, meteorology, construction technology, technical measures, management system, and so on, all of which directly affect the quality of the project construction. Starting from the main content of the water conservancy construction control, this paper analyses the quality control measures of water conservancy project construction, and puts forward several problems needing attention.
Keywords: water conservancy projects; construction control; quality supervision; quality control
中图分类号: TV5 文献标识码:A文章编号:
一、水利施工控制的主要内容
1.作业技术交底的控制
承包单位做好技术交底,是保证施工质量的要求之一。为做好技术交底,项目经理部必须由主管技术人员编制技术交底书,并经项目总工程师批准。技术交底的内容:包括施工方法、质量要求和验收标准,施工过程中需注意的问题,可能出现意外的措施及应急方案等。
2.进场材料的质量控制
凡运到施工现场的原材料,进场前应向项目监理机构提交《建筑材料报验单》,同时附有产品出厂合格证及技术说明书,由施工承包单位按规定要求的检验或试验报告,经监理工程师审查并确认其质量合格后,方准进场。原材料存放条件的控制,尤其是受自然环境和气候影响比较大的诸如水泥、外加剂、防水材料、土工织物材料等,更应严格控制。对于某些当地材料及现场配制的制品,要求承包单位事先进行试验,达到要求方准施工。……