李博
摘要:地铁的供电系统是为地铁运营提供所需电能的重要部门,它不仅为地铁列车提供牵引用电,而且还为地铁运营服务的辅助设施提供电能如照明、环控、通信、信号等。因此安全可靠、而又经济合理地供给电力是地铁正常运营的重要保证和前提。广州地铁二、八号延长线供电系统本着这一要求选择设备运行至今、工作可靠。下面对它作一简要介绍。
关键词:低压400V、S7-300模块、三级负荷、广州地铁、二、八号延长线
Abstract: the power supply system is for the metro operation provide important sectors of electricity needed, it is not only for the subway train provide traction, but also for metro operation of power auxiliary facilities to provide services such as lighting, environmental control, communication, signal, etc. So safe and reliable, and economic reasonably supply power is an important guarantee of the normal operation of the subway with the premise. Guangzhou metro line 2, 8 power supply system in line with the requirement and the choice of equipment operation and reliable work so far. Face it under a brief introduction.
Keywords: low voltage 400 V, S7-300 module, level 3 load and guangzhou metro, two, number eight, an extension cord
中图分类号:U231+.2文献标识码:A文章编号:
一、投复逻辑功能:
1、当地/远方操作:
低压开关一共有四层操作级别:1)当地机械操作;2)当地自动操作;3)站级(变电所内PC机)远方自动操作;4)中心级(OCC)远方自动操作。
“当地/远方”转换开关一共有三组:1)中央信号屏上的“当地/远方”转换开关;2)母联开关柜上的“当地/远方”转换开关;3)三级负荷总开关上的“auto/manual”转换操作按钮。(若三级负荷总开关为框架式断路器则没有“auto/manual”转换操作按钮)
I.当母联开关柜上“当地/远方”转换开关打至“当地”位置时,所有开关(指801、802、803、901、902即低压进线主开关、母联开关及三级负荷总开关)均只能当地进行自动或机械操作,同时三级负荷总开关通过“auto/manual”转换操作按钮,进行自动或机械操作;
II. 当母联开关柜上“当地/远方”转换开关打至“远方”位置时,所有开关(指801、802、803、901、902即低压进线主开关、母联开关及三级负荷总开关)均由远方进行操作,同时根据中央信号屏右上方的“当地/远方”切换开关决定此时控制权在OCC(远方)或是在站级(当地);……