基于PDCA循环的水运工程施工管理研究

2016-10-21 03:10:16李新夫
价值工程 2016年7期
关键词:PDCA循环策略研究施工管理

李新夫

摘要: PDCA循环模型广泛地应用于各类工程建设当中,对完善施工流程、提升安全管理水平、减少安全事故机率、提高工程施工建设效率等有重要的作用。结合水运工程施工而言,展开PDCA循环理论的应用可以协助制定更有效的施工安全计划,应对辨别作业场所的危险因素,明确安全管理的目标,进而构建完善的安全管理体系。本文结合水运工程施工管理中的安全影响因素进行分析,并提出相应地策略。

Abstract: PDCA cycle model is widely used in all kinds of engineering construction, which is important to improve the construction process, improve safety management level, reduce the safety accident risk, and improve the efficiency of engineering construction. Combined with the water transportation project construction, the application of PDCA cycle theory can assist in developing more effective construction safety plans, identify the risk factor in workplaces, clear the goal of safety management, and build a perfect safety management system. In this paper, the factors affecting water transportation project construction management of safety are analyzed, and some strategies are put forward accordingly.

关键词: PDCA循环;水运工程;施工管理;策略研究

Key words: PDCA cycle;water transportation engineering;construction management;strategy research

中图分类号:TU714 文献标识码:A 文章编号:1006-4311(2016)07-0084-03

0 引言

“PDCA”是一种管理学中的重要模式,也是一种通用的施工管理模型,从上世纪30年代被提出之后,不断地进行发展、补充和完善,目前则被广泛地应用在产品质量改善层面,因此也被称之为“质量环”。经过长期实践证明,PDCA模式具有很好的纠错能力和改善能力,通过计划、执行、检查和行动四个主要步骤,实现最终质量的维护;相对应地,基于水运工程施工管理来说,项目安全和人员安全是第一位要考虑的内容,以PDCA循环理论可以建立“以人为本”的安全管理体系,更好地配合《安全生产法》及相关条例,在国家法律法规层面实现对水运工程建设的安全性约束和规范。(如图1)

水运工程是我国重要的交通事业组成部分,相比铁路、公路、管道等路面运输部分,其施工难度更大、涉及因素更多,尤其是针对土木工程管理层面的安全因素管理,直接关系到施工人员的生命安全以及企业财产安全,不可掉以轻心;……

登录APP查看全文

猜你喜欢
PDCA循环策略研究施工管理
PDCA循环应用于
关于提升小学语文阅读教学质量的策略研究
人间(2016年28期)2016-11-10 22:12:59
目的论角度下的英语翻译策略研究
提高小学数学教学有效性的策略研究
试析深基坑支护在市政道路工程中的施工管理
科技视界(2016年21期)2016-10-17 20:42:32
220kV架空线路建设管理
科技视界(2016年21期)2016-10-17 19:56:58
浅谈公路养护工程的施工管理
科技视界(2016年21期)2016-10-17 19:24:37
高速公路路面施工管理探析
科技视界(2016年21期)2016-10-17 19:20:55
初中语文略读课文教学策略研究
成才之路(2016年26期)2016-10-08 11:50:40