王小华



摘 要:自升式钻井平台在浅海区的海洋石油开发中得到了广泛的应用。然而由于浅海油田海域地质及海况复杂,为规避穿刺风险,自升式平台大桩靴化是未来主要发展趋势,桩靴与桩腿组成的整体,是支撑平台上部结构的主要架式结构,也是钻井平台重要组成构件。本文介绍了自升式钻井平台“海洋石油941”的三个桩靴由直径17.98m加大到23m的适应性改造方案及工艺。
关键词:自升式钻井平台;穿刺;大桩靴;适应性改造
中图分类号:U674.38 文献标识码:A
Abstract: Jack-up drilling platform has been widely used in offshore oil development in shallow sea area. However, due to the increasingly complex geology and sea conditions of shallow oil fields, jack-up platform with big spud cans is the main development trend in the future to avoid puncture risk. The integral combination of spud can and pile leg is the main frame structure supporting the superstructure of the platform as well as an important component of the drilling platform. This paper introduces the adaptive modification scheme and technology of three spud cans of the jack-up drilling platform "HYSY941" increasing from 17.98m to 23m in diameter.
Key words: Jack-up rig; Puncture; Big spud can; Adaptive modification
“海洋石油941”是我国建造的第一艘JU2000-E型自升式钻井平台。按照船东要求对平台桩靴进行加大改造,将桩靴直径由原有的17.98 m加大至23 m。并选取WC13-2WHPB井位十年一遇的环境条件进行设计改造。本文阐述该平台改造工程中从设计分析到施工阶段的主要流程及方案。
1 桩靴加大改造可行性分析
设计阶段需对桩靴进行改造后平台在WC13-2 WHPB井位的作业适应性、桩靴加大引起的平台稳性、桩腿强度及拖航阻力等问题进行分析。
1.1 桩靴改造对平台的影響分析
(1)桩靴改造后重量重心计算。
根据业主提供的改造初步方案,将原有桩靴底部结构进行扩充,板材及型材的材质及规格保持不变,桩靴内部的环向及径向加强结构进行延伸;将以上新增结构反映在有限元模型中并进行重量重心计算。由于改造后桩靴重量增大,在预压载时应将升降装置处的载荷较原设计减少相应的压载量,以保证原有的桩端压载力不变。……