靳杰+杨维平+李浙昆
摘要:应急物资调配是应急物流系统重要研究问题之一,直接关系到应急物流活动的成败。考虑到灾后运输道路破损率不能立即确定,构建了道路破损率与物资需求量为梯形模糊数的多目标应急物资调配模型。通过将其转化为具有确定系数的多目标规划模型来进行求解,并提出了求得该模型满意解的算法。最后通过算例分析说明该方法的有效性。
Abstract: Emergency supplies allocation is one of the important problems of the emergency logistics system, which directly relates the realization of the emergency logistics goals. After considering the breakage rate of the road for transportation is uncertain in a short period of time after the earthquake, a multi-objective emergency supplies deployment model is established which contains the breakage rate and material demand in the form of trapezoid fuzzy number. Solve this model through translating it into a deterministic multi-objective programming model and propose the arithmetic to obtain the satisfactory solution. Finally a numerical example shows that this method is valid.
关键词: 应急物流;模糊道路破损率;调配模型;模糊线性多目标规划
Key words: emergency logistics;fuzzy linear multi-objective programming;fuzzy road breakage rate;deployment model
中图分类号:F252 文献标识码:A 文章编号:1006-4311(2014)18-0020-03
0 引言
我国是一个地震灾害频发的国家,近年来接连发生在四川、贵州、甘肃和云南等地的地震灾害,尤其是一些重大地震灾害给人们的生产生活和生命财产带来了巨大的影响,因此加强应急管理,建立应急物流保障体系,制定有效的应急预案刻不容缓。
应急物资调配是突发事件应急管理的重要决策之一,在重大地震灾害发生后,如果缺乏规划合理的应急物资调配方案,就可能会延误应急救援工作。因此合理的应急物资调配方案,不仅可以降低成本,最重要的是能够保证提供应急物资的时效性,而这直接关系着应急物流保障的反应速度与最终成效[1]。国内外许多专家学者在这方面已经做了大方面卓有成效的研究工作[2-7],但是重大的地震灾害一般会造成通往灾区道路的损毁,而其损毁率我们在灾后并不能马上确定,只能在地震灾害发生后通过航空拍摄、实地勘察等手段经行估计,而这无疑给应急物资的调配带来了极大的不确定性。……