摘要:随着我国市场经济的迅猛发展,我国建筑行业的发展也呈上升趋势。其中地基基础造价在建筑工程造价中占有十分重要的地位。本文探讨了地基基础造价超预算的三个主要原因:工程计费方法不准确、施工过程中的浪费以及由地基基础工程造价的特点导致的超预算情况,并针对相应原因提出了预算控制的对策,分别是地基工程招标造价控制、施工过程中造价控制以及完善预算编制。
Abstract: With the rapid development of China's market economy, the development of China's construction industry is also on the rise. Among them, foundation cost plays a very important role in construction cost. This article discusses the three main reasons for over-budgeting of foundation cost: inaccurate engineering billing methods, waste during construction, and over-budgeting caused by the characteristics of foundation engineering cost, and puts forward countermeasures for budget control according to the corresponding reasons, including foundation project bidding cost control, cost control during construction and perfect budget compilation.
关键词:地基;工程造价;预算
Key words: foundation;engineering cost;budget
中图分类号:TU723.3 文献标识码:A 文章编号:1006-4311(2020)22-0059-02
0 引言
在建筑工程中,地基的建造是整个建筑的基础工程,对于整个建筑具有十分重要的作用。地基基础工程在施工过程中涉及到排水、降水、软土置换等一系列复杂的环节,所以地基基础工程施工难度较大,工程造价较高。对地基基础造价超预算的原因及控制对策分析就显得十分重要,这对于我国建筑行业的发展具有重要的意义。
1 地基基础造价超预算的原因
1.1 工程计费方法不准确
当前,我国在地基基础工程造价的计算方法上还没有统一标准,这就导致了在项目工程方案设计的过程中,不准确的工程设计成本与实际施工成本存在一定差异。
1.2 施工过程中造成浪费
在实际的地基基础工程的施工过程中,可能会由于人工价格、社会因素、环境因素等各种原因引起工程的变更,容易导致地基基础工程的施工周期延长、施工成本增加等。事实上上述影响因素具有一定的动态性,导致地基基础工程在造价管理过程中也表现出一定的动态性。……